Footbench All tools
Training

Youth Training-Load Monitor

Add up the week’s load with Foster’s session-RPE method, and see if the plan sits inside the age-appropriate ceiling. No spreadsheets required.

This week’s sessions

Enter a 1–10 RPE (1 = very easy, 10 = max effort) and the duration in minutes for each session. We add a row to get you started.

Weekly load
0
arbitrary units (RPE × min)
Age ceiling
—
rough weekly cap
Recovery time needed
—

Why this matters for youth players

Children’s tendons, bones and growth plates are still developing. The same training load that helps a senior adapt can injure a 13-year-old. Published consensus suggests keeping weekly load growth below ~10% week on week, and not exceeding age-band ceilings, to reduce overuse-injury risk.

How the load is computed

The Foster method multiplies the session’s perceived effort (CR-10 RPE) by the session length in minutes. A 60 min session at RPE 6 gives a load of 360. Summed across the week, it gives a planning figure that’s reproducible without a GPS vest.

How to read the result

  • Green — inside the recommended band. Steady week.
  • Amber — near the ceiling. Add an extra rest day or drop one RPE point somewhere.
  • Red — over the ceiling. Drop a session or cut it to RPE 4–5 before adding volume.

Limitations

  • Children under ~12 often can’t rate RPE reliably. Use a coach’s assessment instead.
  • The age ceilings are population averages, not safety thresholds. Individual injury risk varies.
  • Match load depends on minutes played — a 20-min substitute shift is not the same as a full match.

FAQ

What RPE should a recovery session get?

2–3. Light technical work, active stretching, mobility. If they’re sweating heavily, it wasn’t a recovery session.

How do I score a match?

Use the player’s minutes × an estimated RPE based on position (e.g. CB 6, winger 8). This tool treats match as another row.

Should I count gym sessions?

Yes, with an RPE that reflects the working sets. A 45 min hypertrophy session at RPE 7 ≈ 315. Don’t double-count rest periods.